Item No. |
N268 |
Composition |
Nylon 50% Polyester 50% |
Weight |
6.5Y/KG |
Width |
150+-5CM |
Height |
2.5CM |
Our Advantage:
No worry about shortage of lace trim and lace fabric.
Professional manufacturer.
Delivery time:normally 15days.
FAQ:
1.How many days will sample be finished? About mass production lead time?
sample lead time is about 5 days,The mass production lead time is depended on your order, it is usually about 15 days.
2.what is the packing?
roll packing with thick plastic bags; outer: woven bags in bales; all labels, shipping marks and packing method can be done in buyer's way
http://www.kesinlacechina.com/